Heavy / Oversized Cargo Services:
GSE being specialized in the haulage of heavy and oversized cargo of machineries/ transformers by utilizes the modular hydraulic multiaxle trailers which have high traction power to manoeuvre through tight confines of sites and yards. Haulage of these oversized machineries or transformers begins from:
1) Port to site or site to site
2) Site loading (by skidding method using jack or using crane)
3) Transportation through towns and country using detailed route maps with photos showing the exact terrain and roads
4) Site unloading
5) Positioning of machineries or transformers onto foundation plate at site
6) Including erection, installation and commissioning of power transformers.
All these activities are accomplished with proper management and with continuous supervision. GSE has transported transformers, generators, turbines, boilers and dismantled factory machineries.
The scope of works will involve works in carrying out the normal services including additional works as mentioned below:
1) Detailed load design and route survey
2) Heavy haulage
3) Tug and barge for specialized cargo for both domestic and international
4) Skidding and positioning (site unloading)
5) Installation and erection
6) Erection and commissioning of transformers
7) Cable laying and rentis clearing
8) Total project management and supervision
1) Jacking & Skidding method of unloading and positioning:
Skidding 1 Unit 120 MVA Transformer (126 Ton) |
Skidding and Shifting 1 unit x 90 MVA Transformer (100MT) |
2) Installation:
Installation of 500MT Press Machine |
Installation of 1 unit radar for sea traffic surveillance unit by Helicopter service at Pulau Angsa |
JOB AT M/S TRW STEERING AND SUSPENSION SDN BHD (08.08.2008)
1 UNIT OF STAMPING MACHINE (80 METRIC TONS)
Transportation by multiaxle trailer from Port Klang to Prai, Penang inclusive of unpacking, removal, jacking and sliding method onto designated foundation inside the factory.
TRANSPORTATION OF 2 UNITS X 43 METRIC TONS TRANSFORMERS BY MULTIAXLE TRAILER FROM MALAYSIA TRANSFORMER MANUFACTURING FACTORY, ULU KLANG TO PPU TOP GLOVE, JLN. MERU, KLANG
Total Weight: 86 Metric Tons
2 units of 30 MVA 33/11 KV (MTM) Transformers on 6 Lines Multiaxle Trailer to be delivered to PPU Top Glove, Jln Meru, Klang.
Transformers are jacked down utilizing Support Beams & Elephant Stools and Trailer Hydraulic System to increase or decrease the Height Level
3) Lifting:
Direct discharge 120 Tons Kiln Shell onto Multiaxle Trailers
|
Lifting Project Cargo by Crane
|
Lifting Project Cargo by Crane onto Tug and Barge
|
4) Jacking and Sliding:
|
|
|
|
|
Jacking and Sliding –
180 Tons onto Plinth |
Jacking and Sliding –
90 Tons onto Temporary Plinth |
Jacking and Slide 1 Unit 80MT Gen.Set at Pulau Tioman |
PROJECT HANDLING OF MOBILE CRUSHER UNIT FROM FACTORY TO OUR TRANSIT YARD/WAREHOUSE, TEMPORARY STORAGE AND FINAL DELIVERY TO VESSEL AT NORTHPORT FOR SHIPMENT TO AUSTRALIA.
Client: M/S FL SMIDTH
Date: 7/08/2008
Transit Handling of Project Shipment from M/S Vantage, Bkt Kemuning to Port Klang and later redeliver to Vessel
Loading and unloading by Mobile Crane and Temporary Storage at our Warehouse Telok Gong, Port Klang
5) Transportation:
Transporting armoured tank for Malaysian Army |
Transport 1 unit 90 MVA transformer (120MT) including Skidding at MSW. Bukit Raja, Klang
16 Lines Multi Trailer Transporting 235MT Tx at Kapar P. Station
|
Transportation of 120MT kiln shell at Perak Hanjoon Simen |
10 Axle Line Transportation 1 unit 80MT boiler |
6) Shifting:
Shifting 1 Unit Auto Tx (180MT) at PKPS |
|
Shifting 1 x 30MVA (45MT) above a Multilevel Car Park Building at Shah Alam |
|
|